Monday, August 25, 2014

Monday morning delivery!

I was very pleased to receive a call at 8:10am today from Ferguson that my appliance delivery was on-site and needed someone to let them in. Conveniently, I was on my way out the door for work and was able to swing by. I only stuck around long enough to learn that the refrigerator was too large to fit through the doorway and that they would have to dissemble the entire refrigerator. That was enough stress for a Monday morning so I left to head into work. Pics to follow whenever I can get around to stopping by the house again...

Friday, August 22, 2014

More fixtures and finishes going in....

The week wrapped with several small but important advances. See below.

The vanity lights were installed in both bathrooms. 

Half bath

Master bath (the left side; there are actually 2 of these)

The shoe moldings went in which definitely complete the look.

Moldings in the family room

The chandelier was installed over the eating area.

Eating area looking into kitchen

The fan was installed in the master bedroom.

Master bedroom fan

Wednesday, August 20, 2014

Hardwood floors are complete!

The guys got started sanding and staining the hardwood floors earlier this week. Now they are complete and looking gorgeous! The odor is pretty strong and they need a few days to fully dry. Next up: shoe molding installation and other fixture installation (fans, etc).

Family room looking into kitchen (and dining room entrance and mudroom in the distance)
Kinda fuzzy, but this is the master bedroom
Mudroom cubbies

Thursday, August 14, 2014

Progress

A few things were crossed off the list this week:

Since Dominion did their thing, our old meter was officially removed and a new one was installed. Therefore, the guys patched up the wall and completed the floor where the old meter was. Trim work is being completed.

Site of the old power meter has been patched


Fixtures have started being installed. Faucets are in!


Master bathroom faucets (double vanity)

Kitchen faucet installed (we're re-using our old faucet & sink since they were relatively new)

Tile has been delivered! They will install the backsplash in the kitchen and the master bathroom tile after the hardwood floors are sanded and stained.

White matte subway tile for master bathroom shower walls

White matte hexagon tile for master bathroom shower floor (will be paired with gray grout)

Tile for chair rail in master bathroom shower (white matte)

Glossy white subway tiles for kitchen backsplash

Friday, August 8, 2014

Countertops are IN

The honed carrera marble counter tops for the kitchen and master bathroom vanity were delivered and installed! The guys also did the edging on-site. We went for an "eased" edge.

They're in!

Working on the edging in the kitchen

In action on bathroom counter installation

Sneak peak












Tuesday, August 5, 2014

Mantle, knobs and lights

A few updates to note over the past couple of days:

The mantle was completed.





All interior door knobs were installed.



Pendant lights over the kitchen island were installed. 


Friday, August 1, 2014

What's up next

With all of the progress over the past two weeks, we still have lots of work ahead of us and lots of decisions to make.

Work coming up:

PAINTING EXTERIOR & INTERIOR TRIM

Waiting on the exterior and interior trim around windows, doorways and baseboards to be painted.

FINISHING THE DECK

The deck is just about complete, but the stairs still need to be built. We have to wait for Dominion to finish burying the power lines before this can be completed.

COUNTER TOPS

The templaters came yesterday to do the measurements for the marble countertops for the kitchen and master bathroom. Here is a pic of the "lot" that we chose from Arc.




MASTER BATH TILE

We selected the tile several weeks ago, but since it was on back order, we are awaiting delivery and installation of the floor tile and shower tile.

BACKSPLASH

We have decided to go with a glossy white subway tile with a light gray grout. Awaiting installation.

HARDWARE INSTALLATION

After a million trips to the hardware store, we decided on polished nickel bin pulls and polished nickel knobs for both the kitchen and master bathroom vanity. We decided on polished nickel over chrome because it has a bit of a richer look.

Bin pulls: http://www.homedepot.com/p/Martha-Stewart-Living-Bedford-3-in-Polished-Nickel-Canopy-Cup-Cabinet-Hardware-Pull-136306-0/202241364

Knobs: http://www.lowes.com/pd_20988-54151-D2051-31.75NP_0__?productId=3200847

Decisions to make

Bathroom accessories: Need to select TP holders and towel racks. We're thinking chrome (shiny) for both, as to coordinate with the other fixtures. Need to pull the trigger.

Bathroom mirrors: Need to select mirrors. Thinking two medium size white framed mirrors for the master bath; and a frameless oval mirror for the half bath. Again, need to pull the trigger.

Thursday, July 31, 2014

Lots of updates!

Since we were out of town all last week, and this week has gone by quickly, I have LOTS of updates to report.

FLOORS

The hardwood floors are being installed in the addition. They will be stained to match the color of the floors in the old part of the house.

Family room into kitchen


EXTERIOR PAINT

The exterior of the house has been painted. This includes the siding on the addition as well as the brick on the original part of the house. We used Coventry Gray.

Gray house, white trim, new sidewalk (pics of the back of the house below)


DECK

The structure of the deck has been built. The railings and stairs are being installed.

In progress

Still in progress

Helpers - Bear & Billy

View from above

Railings


INTERIOR PAINT

The interior has been painted. This includes Revere Pewter in the family room, kitchen and hallway; Stonington Gray in the Mudroom; Whisper Gray in the half bath; and Graytint in the master bedroom and master bathroom (all Benjamin Moore). 


Master bedroom

Hallway from family room to master

KITCHEN CABINETS & MASTER VANITY

The kitchen cabinets (white, shaker style) were installed on Monday. We are using the same material for the master vanity.
 

New kitchen!

Close up on cabinets to the left of where the refrigerator will be

Close up on the back wall of the kitchen where the gas range/oven and vent hood will be

Master bathroom vanity

MUDROOM BEAD BOARD

4' bead board wraps the mudroom & full height on the cubbies


Friday, July 18, 2014

One more post before vaca -- Sidewalk laid and cubbies in

Lots of progress on a Friday! The guys laid the sidewalk (stamped concrete in a slate color) and it's looking great. A vast improvement over our old cracked sidewalk.




The cubbies/bench were also installed in the mudroom.


Thursday, July 17, 2014

A few more selections + much-needed vacation

This week, we made some additional selections.

1) We agreed on a configuration for the mudroom cubbies/storage unit. We will have a wood-stained bench plus three tall "locker"-like cubbies along one wall. We'll be doing 4' beadboard around the entire mudroom as well.
2) We selected door knobs (see here: http://www.myknobs.com/shlf10sie619.html) for all interior doors and exterior doors.
3) We agreed on closet shelving configuration for the two master closets, which included who got which closet (his on the left; mine on the right).
4) We agreed on closet shelving for the two hallway closets.
5) We agreed on a color for our new stamped concrete front walkway.  We are going with "slate."
6) We selected three "lot" options for honed white carrara marble for our kitchen counter tops.  Hopefully we can find a remnant of a similar material to use for the master bath vanity top.
7) We agreed on a new deck configuration -- clipped the outside corners and added a landing with two sets of stairs.  Definitely think this will have a cooler effect than the original design.
 
We are headed on vacation to Florida for seven days, and likely will checked out from making any major renovation decisions or selections for that time.  However, progress will ensue back at 7603. This includes interior trim, exterior and interior painting, and maybe even installation of our kitchen cabinets and master bathroom vanity!  Lots of pics to be posted after vacation.




Wednesday, July 16, 2014

Mother Nature's Fury

Tuesday night's brief storm barreled through 7603's yard. An oak tree in our yard crashed to the ground, taking out a power line and our fence (and maybe our neighbor's fence) in the process. Fortunately it did NOT crash onto the newly-built deck (!!!) or the house. Phewww! Nonetheless, we lost power, as did most of our neighbors (sorry) and we are left to clean up the mess. We'll get the tree removed and see how we will go about repairing the fence. Once the tree is removed, we can assess the damage (if any) to our neighbor's fence.


Monday, July 14, 2014

Front stoop & sidewalk

The guys made some headway on the front stoop this week. They also demo'ed the front sidewalk. We will be doing stamped concrete in a slate color.

Columns and roof coming together on front stoop. Bye bye old poured concrete sidewalk.

Saturday, July 12, 2014

Exterior paint selected!

After much back and forth, we have decided to go with Benjamin Moore's Coventry Gray for the exterior of the house. This includes all of the brick and the siding. This was option "B" per my original post.

HC-169 / Benjamin Moore Coventry Gray

Wednesday, July 9, 2014

Siding & Trim

Today the crew started putting up the exterior siding and trim. It will eventually be painted (see post about exterior paint colors -- still TBD).

Standing in back yard looking up (and slightly right) toward the house

Tuesday, July 8, 2014

Drywall complete!

The guys finished the drywall late last week. Things are looking really good! Pics below.

Next steps (this week, next week and the following):
1) Install all of the interior trim
2) Build the deck
3) Install kitchen cabinets
4) Basic clean up, remove plastic & turn the AC units back on

Looking from family room into eating area and kitchen
Looking from eating area into kitchen
Master bedroom

Tuesday, July 1, 2014

Insulation & Drywall

There wasn't too much activity last week (finishing up electrical, digging holes for the deck footings) but this week has seen quite a bit of action already!

Yesterday the insulation was installed (double insulation around the master bath -- thanks, dad). And today, the drywall installation began. It's really starting to come together!


Drywall goes up on the ceiling in the family room

Guys in action in the family room

View looking from kitchen into family room toward fireplace & mudroom

Drywall going up in master bedroom