Thursday, August 14, 2014

Progress

A few things were crossed off the list this week:

Since Dominion did their thing, our old meter was officially removed and a new one was installed. Therefore, the guys patched up the wall and completed the floor where the old meter was. Trim work is being completed.

Site of the old power meter has been patched


Fixtures have started being installed. Faucets are in!


Master bathroom faucets (double vanity)

Kitchen faucet installed (we're re-using our old faucet & sink since they were relatively new)

Tile has been delivered! They will install the backsplash in the kitchen and the master bathroom tile after the hardwood floors are sanded and stained.

White matte subway tile for master bathroom shower walls

White matte hexagon tile for master bathroom shower floor (will be paired with gray grout)

Tile for chair rail in master bathroom shower (white matte)

Glossy white subway tiles for kitchen backsplash