Thursday, July 17, 2014

A few more selections + much-needed vacation

This week, we made some additional selections.

1) We agreed on a configuration for the mudroom cubbies/storage unit. We will have a wood-stained bench plus three tall "locker"-like cubbies along one wall. We'll be doing 4' beadboard around the entire mudroom as well.
2) We selected door knobs (see here: http://www.myknobs.com/shlf10sie619.html) for all interior doors and exterior doors.
3) We agreed on closet shelving configuration for the two master closets, which included who got which closet (his on the left; mine on the right).
4) We agreed on closet shelving for the two hallway closets.
5) We agreed on a color for our new stamped concrete front walkway.  We are going with "slate."
6) We selected three "lot" options for honed white carrara marble for our kitchen counter tops.  Hopefully we can find a remnant of a similar material to use for the master bath vanity top.
7) We agreed on a new deck configuration -- clipped the outside corners and added a landing with two sets of stairs.  Definitely think this will have a cooler effect than the original design.
 
We are headed on vacation to Florida for seven days, and likely will checked out from making any major renovation decisions or selections for that time.  However, progress will ensue back at 7603. This includes interior trim, exterior and interior painting, and maybe even installation of our kitchen cabinets and master bathroom vanity!  Lots of pics to be posted after vacation.




No comments:

Post a Comment